Qatar
Consultancy Services to Power Sector (Kahrahmaa), Qatar
Client: Kahrahmaa (Qatar General Electricity & Water Corporation)
Company: WSP Parson Brinkerhoff
Position held: Senior Project Manager
Projects:
Package S1:
132/11kV Logistic Village Substation
New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (AIS/GIS), 132/11 kV power transformers, 11/O.415kV station service transformer and associated equipment.
220/132/66/11kV Doha Industrial Super Substation
New Transmission Substation (replacement of the existing 132/66/11kV Saliyah substation) incorporating 220kV GIS, 132kV GIS, 66kV GIS and metal enclosed switchgear GIS 220/132kV
autotransformer’s, 132/66kV and 66/11kV power transformers, 11/0415kV station service transformers, other associated equipment and diversion of the existing cables and OHL connected to the existing Saliyah SS.
132/11kV University South Substation
New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (AIS/GIS), 132/11 kV power transformers, 11/0.415kV station service transformer and associated equipment.
132/66/11kV Gharafa Substation
New Transmission Substation (replacement of the existing 132/66/11kV Gharafa substation) incorporating 132kV GIS; 66kV GIS, 11kV metal enclosed switchgear (AIS/GIS), 132/66kV and 66/11kV
power transformers, 11/O.415kV station service transformers, 132kV shunt reactors, other associated equipment and diversion of the existing cable lines connected to the existing Gharafa SS.
Gharafa Substation Cable diversion works:
Totally 9 nos. of 132kV cable circuits and 4 nos. of 66kV cable circuits have to be diverted as per scope of works.
132/33kV QP Halul Substation
New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (AIS/GIS), 132/33 kV power transformers, 33/0.415kV station service transformer and associated equipment
Package S6:
132/11kV Umm Salal Central Substation and associated cable circuit
New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (AIS/GIS), 132/11kV, 40MVA power transformers, 11/0.415kV station service transformer and associated equipment as required.
Umm Salal Central to Jeriyan Jenihat Super:
132kV, 1Cx2000mm², Cu/XLPE, 250MVA, Double circuit underground cable. Feeder-1: 2324.00 m, Feeder-2: 2088.87 m
132/11 Al Dhakhira Substation and cable circuit
New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (AIS/GIS), 132/11kV, 40MVA power transformers, 11/0.415kV station service transformer and associated equipment as required.
Al Dhakhira to Khore North: 132kV, 1Cx2000mm², Cu/XLPE, 250MVA, Double circuit underground cable. Feeder-1: 2275.12 m, Feeder-2: 2265.70 m
Package-S7:
Telecom works for 27 Substations in Phase X, Fiber optic cable connections, required Telecom Services, Substation layout for fiber optic approach cables/Telecom room layout for Telecom panels.
Package-ADD:
Duhail Super to Jeriyan Jenihat Super: 220kV, 1x2500 sqmm Cable, Cu/XLPE, 515MVA, Double circuit underground cable. Feeder-1: 7320.88 m, Feeder-2: 7093.91 m
RAF-B to Al Thumamah: 220kV, 1Cx2500 sqmm Cable, Cu/XLPE, 515MVA, Single circuit (circuit-2) underground cable. Feeder-2: 5440.54 m.
Package-C1:
QP Halul to Ras Girtas: 132kV, 1Cx2000mm², Cu/XLPE, 250MVA, Double circuit underground cable. Feeder-1: 1873.44 m, Feeder-2: 1897.67 m
University South to Al Ebb: 132kV, 1Cx2000mm², Cu/XLPE, 250MVA, Double circuit underground cable. Feeder-1: 5638.04 m, Feeder-2: 5700.08 m.
Package-C3:
Power Supply and Telephone connections to the MUX equipment
DIS to Saliyah Super: 220kV, 1x2500 sqmm Cable, Cu/XLPE, 515MVA, Double circuit underground cable. Feeder-1: 9362.18 m, Feeder-2: 9567.94 m